Removal |
1. |
Release the PCV pad. |
2. |
Disconnect the vapor hose (A). |
3. |
Remove the PCV valve (B). |
Inspection |
1. |
Insert a thin stick (A) into the PCV valve (B) from the threaded side to check that the plunger moves.
|
Installation |
1. |
Install in the reverse order of removal.
|
Oil Level Gauge & Pipe Repair procedures
Removal and Installation
1.
Remove the oil level gauge rod (A) and the oil level gauge (B).
Tightening torque:
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~ 16.6 lb-ft)
...
Scheduled maintenance service
Follow the Normal Maintenance Schedule if the vehicle is usually operated where
none of the following conditions apply. If any of the following conditions apply,
follow the Maintenance Under Sever ...