Inspection |
1. |
Turn the ignition switch OFF. |
2. |
Disconnect the PCSV connector. |
3. |
Measure resistance between the PCSV terminals 1 and 2. |
4. |
Check that the resistance is within the specification.
|
Removal |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) terminal. |
2. |
Disconnect the purge control solenoid valve connector (A). |
3. |
Disconnect the vapor hoses (B) from the purge control solenoid valve. |
4. |
Remove the valve from the bracket. |
Installation |
|
1. |
Install in the reverse order of removal.
|
Certification label
The certification label is located on the driver's door sill at the center pillar.
This label shows the maximum allowable weight of the fully loaded vehicle. This
is called the GVWR (Gross Vehi ...
Immobilizer system
Your vehicle is equipped with an electronic engine immobilizer system to reduce
the risk of unauthorized vehicle use.
Your immobilizer system is comprised of a small transponder in the ignition key ...