Measure voltage between supplied power and ground at inhibitor switch circuit.
Specification: Approx. 12V
Signal Circuit Inspection
1.
Connect the Inhibitor switch connector.
2.
Ignition KEY "ON" & Engine "OFF".
3.
Measure the voltages between each terminal and chassis ground in each range (P, R, N, D).
Signal Code Table
 
P
P-R
R
R-N
N
N-D
D
Signal "1"
12V
12V
0
0
0
0
0
Signal "2"
0
12V
12V
12V
0
0
0
Signal "3"
0
0
0
12V
12V
12V
0
Signal "4"
0
0
0
0
0
12V
12V
Removal
1.
Place the shift lever into the "N" position.
2.
Remove the battery and battery tray.
(Refer to Engine Electrical System - "Battery")
3.
Disconnect the inhibitor switch connector (A) and loosen the shift cable mounting nut (B).
4.
Remove the manual control lever (B) and the washer after removing a nut (A).
5.
Remove the inhibitor switch (A) after loosening the bolts.
Installation
1.
Check that the shift lever is placed in the "N" position
2.
Install the inhibitor switch (A).
Lightly tighten the inhibitor switch mounting bolts so that necessary adjustments can be made.
3.
Install the manual control lever (A).
Lightly tighten the manual control lever nut so that necessary adjustments can be made.
4.
Align the hole (B) in the manual control lever with the "N"
position hole (A) of the inhibitor switch and then insert the SST
inhibitor switch guide pin (09480-A3800).
5.
Tighten the nut (A) and bolts (B) to the specified torque.
Components
1. Shift lever2. Shift lever bracket3. Main shaft4. Manual mode switch housing5. Shift lock solenoid6. Key interlock switch7. Main connector8. Shift cable assembly9. Shift cable retain ...
Other Information:
Fuel Line Repair procedures
Inspection
Visually check the fuel lines for cracks, leakage, loose connections, deformation or tank band looseness.Removal
High pressure fuel pipe (High pressure fuel pipe ↔ Delivery pipe)
...