Adjustment |
1. |
After loosening the tail gate hinge (A) mounting bolt, adjust the tail gate by moving it up and down, or right and left. |
2. |
Adjust the tail gate height by turning the tail gate overslam bumpers (B). |
3. |
After loosening the tail gate striker (C) mounting bolts,
adjust the tail gate striker by moving it up and down, or right and
left. |
CVVT & Camshaft Repair procedures
Removal
Continuous Variable Valve Timing (CVVT)
1.
Remove the timing chain.
(Refer to Timing System - "Timing Chain")
2.
Remove the CVVT assembly.
•
A: LH exhaust CVVT
•
...
Hood Assembly Components and Components Location
Component Location
1. Hood assembly
...