Kia Sedona: Reservoir Tank Repair procedures - Cooling System - Engine Mechanical System - Kia Sedona YP Service ManualKia Sedona: Reservoir Tank Repair procedures

Third generation YP (2014-2026) / Kia Sedona YP Service Manual / Engine Mechanical System / Cooling System / Reservoir Tank Repair procedures

Removal and Installation
1.
Disconnect the over flow hose (A), and then drain the coolant from the reservoir tank.
2.
Remove the reservoir tank (B).

Tightening torque :
7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ~ 8.7 lb-ft)

3.
Install in the reverse order of removal.
4.
Refill the coolant.
Radiator Repair procedures
Removal and Installation 1. Disconnect the battery negative terminal. 2. Remove the engine room under cover. (Refer to Engine And Transaxle Assembly - "Engine Room Under Cover") 3. Drain ...

Water Temperature Control Assembly Components and Components Location
Components 1. Water pipe 2. Throttle body coolant hose & pipe3. Water temperature control assembly4. O-ring ...

Other Information:

Certification label
The certification label is located on the driver's door sill at the center pillar. This label shows the maximum allowable weight of the fully loaded vehicle. This is called the GVWR (Gross Vehi ...

26 Brake Control Solenoid Valve(26/B_VFS) Description and Operation
Description • 26 Brake control solenoid valve is a Variable Force Solenoid (VFS) type. • When TCM supplies variable current to solenoid valve, hydraulic pressure of 26 brake is ...

Categories

Copyright © www.kisedona.com 2016-2026