Inspection |
1. |
Turn the ignition switch ON. |
2. |
Manually operate the control switch and measure the voltage of the blower motor. |
3. |
Operate the control switch to raise the voltage up to high speed. Specification
|
4. |
If the measured voltage is not within specification,
substitute with a known-good field effect transistor and check for
proper operation. |
5. |
Replace the field effect transistor if it is proved that there is a problem with it. |
Replacement |
1. |
Disconnect the negative (-) battery terminal. |
2. |
Remove the glove box housing.
(Refer to Body - "Glove Box Housing") |
3. |
Disconnect the connector (A) and then remove the field effect transistor (B) after loosening the mounting screws. |
4. |
Install in the reverse order of removal. |
Purge Control Solenoid Valve (PCSV) Repair procedures
Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the PCSV connector.
3.
Measure resistance between the PCSV terminals 1 and 2.
4.
Check that the resistance is within the speci ...
Specifications
Specifications
ItemsSpecificationHoodType Rear hinged, gas lifter typeFront DoorStructureFront hinged, frame door structureRegulator systemWire drum typeLocking systemPin-fork systemRear DoorSt ...